:: Volume 12, Issue 2 (Summer 2009) ::
IJE 2009, 12(2): 73-88 Back to browse issues page
Optimization BMS For Loshan TTP2
D Biazar * , F Rajabi
Abstract:   (8174 Views)
In this Paper, Burner Management System and relevant protections survey on LOSHAN Thermal Power Plant. The new control system is dedicated to combustion safety and operator assistance in the starting and stopping of fuel preparation and burning equipment and for the preventing misoperation designed according to NFPA 85 standard for restrain of boiler explosion. However, The new design modified logic for boiler purge, interlocks for burners start up and shutdown and boiler protections and logic main valves in boiler.
Keywords: Boiler, Burner, BMS
Full-Text [PDF 317 kb]   (2222 Downloads)    
Type of Study: Research | Subject: Energy Planning Models
Received: 2011/11/23 | Published: 2009/07/15


XML   Persian Abstract   Print



Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 12, Issue 2 (Summer 2009) Back to browse issues page