[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
The 9th International Energy Conference
..
:: Volume 12, Issue 4 (Winter 2010) ::
IJE 2010, 12(4): 1-12 Back to browse issues page
Environmental Approach For Zanjan Power Plants (No.1 & 2) Site Selection
A Samiei * , M.R Ashrafzadeh , A Moghaddam
Abstract:   (9367 Views)
This study provides Zanjan power plants (No.1&2) site selection in ‌‌‌Zanjan province. An ecological model of industrial–urban development, performance by Makhdoum (1999), was used for site selection as a multi- factors method. This model includes three priorities to distinguish between proper and improper lands for developmental activities. According to this model, while development is considered in a region, the land characteristics and features should be known at first. Then these features are evaluated compare to any priorities of the model. Finally, the result will be conducted as a map in which the proper and improper lands are clearly defined for the specified developmental activity. In this regard, the present state of environment was analyzed in three parts: Physical, natural and manmade environment. Considering national environmental criteria and standards, 27 factors were presented in a check- list for different options of site. Consequently, about 90 great ecosystems were defined through performing preliminary studies and conducting maps of slop, aspect, elevation and land units. Then 6 units were defined as proper places and 14 units as semi- proper ones. In the next stage, 7 sites were distinguished based on combining geographic, seismic and water resources data and also preliminary site visits among 20 proper and semi- proper places. Finally, site of no.5 (close to Zanjan- Miyaneh road) was selected as first in ranking
Keywords: Site Selection, Gaseous Power Plant, Environmental Approach
Full-Text [PDF 266 kb]   (2241 Downloads)    
Type of Study: Research | Subject: Energy Planning Models
Received: 2011/11/23 | Published: 2010/01/15
Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Samiei A, Ashrafzadeh M, Moghaddam A. Environmental Approach For Zanjan Power Plants (No.1 & 2) Site Selection. IJE 2010; 12 (4) :1-12
URL: http://necjournals.ir/article-1-47-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 12, Issue 4 (Winter 2010) Back to browse issues page
نشریه انرژی ایران Iranian Journal of Energy
Persian site map - English site map - Created in 0.05 seconds with 39 queries by YEKTAWEB 4645