[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
The 9th International Energy Conference
..
:: Volume 17, Issue 1 (4-2014) ::
IJE 2014, 17(1): 0-0 Back to browse issues page
Feasibility study and economic evaluation of wind energy in north of Khuzestan province : case study of shush-tar
Mojtaba Biglari * , Ehsanolah Assareh , Mojtaba Nedaei , Iman Poultangari
Abstract:   (9305 Views)
This article presents an assessment of wind energy during 20 months with the time interval of 10-minutes in Shush-tar station in Iran. Weibull distribution function was used to model the wind data. In the first phase of the study,the error obtained from Weibull distribution was compared with three other models namely, Rayleigh, Logistic and Log-normal. It was concluded that Weibull distribution is the best function to model the wind speed in Shush-tar. From the initial evaluation of wind data, it was found that the studied site doesn’t have sufficient wind potential for using large and medium scale wind turbines.Thus an economic evaluation of three small wind turbines was performed on RETScreen® software.The economical indicators like the simple payback period, the Benefit-cost ratio, the net present value, and the cost of renewable energy production showed that the proposed small wind turbines are not feasible in the city of Shush-tar. It was suggested that in addition to the study of other renewable sources such as solar energy in shush-tar,a feasibility study for installation of a hybrid system which uses both solar photovoltaic panels and a small wind turbine can be considered for the next study.
Keywords: Wind energy, Shush-tar, Khuzestan, Weibull function, RETScreen
Full-Text [PDF 542 kb]   (3045 Downloads)    
Type of Study: Research | Subject: Energy Planning Models
Received: 2014/06/22 | Accepted: 2014/06/22 | Published: 2014/06/22
Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Biglari M, Assareh E, Nedaei M, Poultangari I. Feasibility study and economic evaluation of wind energy in north of Khuzestan province : case study of shush-tar. IJE 2014; 17 (1)
URL: http://necjournals.ir/article-1-670-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 17, Issue 1 (4-2014) Back to browse issues page
نشریه انرژی ایران Iranian Journal of Energy
Persian site map - English site map - Created in 0.05 seconds with 39 queries by YEKTAWEB 4645